| Date Assigned |
Date Due |
Topic |
HW Assignment |
Reading Assignment |
| 01/09/08 (L01) |
01/14/08 (L03) |
Flexure - Beams and Girders |
|
AISC Spec. Sections F1 - F5 |
| 01/11/08 (L02) |
01/14/08 (L03) |
|
Fabricated
Beam Analysis |
|
| 01/14/08 (L03) |
01/16/08 (L04) |
|
Beam
Non-Compact Flange |
|
| 01/16/08 (L04) |
01/18/08 (L05) |
|
Beam
Non-Compact Web |
|
| 01/18/08 (L05) |
01/23/08 (L06) |
|
Beam
Slender Web |
|
| 01/23/08 (L06) |
01/28/08 (L08) |
|
Singly Symmetrical Beam |
|
| 01/25/08 (L07) |
|
Bracing of Beams |
|
AISC Spec. Appendix 6,
Bracing of Beams |
| 01/28/08 (L08) |
|
|
|
|
| 01/30/08 (L09) |
02/06/08 (L11) |
Shear - Beams and Girders |
Shear
in Unstiffened Webs |
AISC Spec. Sections G1-G3,
Shear Provisions |
| 02/08/08 (L12) |
Shear
in Stiffened Webs |
|
| 02/04/08 (L10) |
|
|
|
| 02/06/08 (L11) |
|
|
|
| 02/08/08 (L12) |
02/15/08 (L15) |
Load and resistance factors for Bridges |
Bracing Requirements for Bridge Girder |
|
| 02/11/08 (L13) |
|
Live Load Distribution
Factors for Bridges |
Obtain
QConBridge Software |
Live Load Distribution
Factors |
| 02/13/08 (L14) |
02/22/08 (L17) |
Loads on Bridge Girders |
Loads
on Bridge Girders |
|
| 02/15/08 (L15) |
|
Intro to Composite Beams |
|
AISC Spec. Section I3 |
| 02/20/08 (L16) |
03/03/08 (L21) |
Composite Beams - Effective
Width |
Analysis of Composite Beams (AISC) |
|
| 02/22/08 (L17) |
|
Moment Capacity- PNA in Slab |
|
|
| 02/25/08 (L18) |
|
Moment Capacity- PNA in Beam |
|
|
| 02/27/08 (L19) |
|
Moment of Inertia |
|
|
| 02/29/08 (L20) |
|
Composite Beams |
Bridge
Girder: Composite Beam Analysis |
|
| 03/03/08 (L21) |
|
Composite Beams |
|
|
| 03/05/08 (L22) |
|
Continuous Beams |
|
|
| 03/07/08 (L23) |
|
Composite Beams: Negative
Moments |
|
|
| 03/17/08 (L24) |
|
Continuous Beams/Plastic
Analysis |
Design
of Continuous Beam |
|
| 03/19/08 (L25) |
|
Plastic Analysis |
|
|
| 03/21/08 (L26) |
|
Plastic Analysis/
Cantilevered Construction |
|
|
| 03/24/08 (L27) |
|
Splices in Continuous Beams |
|
|
| 03/26/08 (L28) |
|
AISC and AASHTO Splice
Provisions (01 -
02) |
Splice
Design for W36x135 |
|
| 03/28/20 (L29) |
|
AISC and AASHTO Splice
Provisions |
|
|
| 03/31/08 (L30) |
|
Bolted Connection Review:
Elastic Analysis |
|
|
| 04/02/08 (L31) |
|
Bolted Connection Review:
Ultimate Strength |
|
|
| 04/04/08 (L32) |
|
Beam-Column Connections |
|
|
| 04/07/08 (L33) |
04/18/08 (L38) |
Beam-Column Connections -
Local Effects |
Beam-Column Connections:
Analysis problem and
Design problem |
AISC Spec. Section J10 |
| 04/09/08 (L34) |
|
Prying Action |
|
AISC Manual pages 9-10 to 9-12 |
| 04/11/08 (L35) |
04/30/08 (L43) |
Prying Action Example,
Whitmore Section |
Beam-Girder
Connection Analysis |
AISC Manual pages 9-3 to 9-4 |
| 04/14/08 (L36) |
|
Engineering and Failures |
|
|
| 04/16/08 (L37) |
|
Box Girders |
|
|
| 04/18/08 (L38) |
05/08/08 (L44) |
Girder Design Considerations |
Bridge Girder Design Project
01 02 |
|
| 04/21/08 (L39) |
|
Review of Beam-Column Connections |
|
|
| 04/23/08 (L40) |
|
Review of Welded Connections |
|
AISC Manual pages 16.1-93 to
16.1-102 |
| 04/25/08 (L41) |
|
Eccentric Loads on Welds |
|
AISC Manual pages 8-9 to 8-14,
8-65, 8-66, 8-90 |
| 04/28/08 (L42) |
|
Fatigue |
|
AISC Spec. Appendix 3 |
| 04/30/08 (L43) |
|
|
|
|
| 05/02/08 (L44) |
|
Last Lecture |
|
|
| 05/08/08 (05/14/08) |
|
final date for accepting work
from on campus students (off-campus students) |
|
|