Links to other courses by Professor
Bayomy:
CE357
CE575
CE556
CE577
| |
Last Update: 04/11/2008
|
Assignment |
Subject and Problem Reference |
Tentative Due Date (During Class)
|
| 1 |
Reading Assignment:
Please read Chapter 1.
Refer to textbook, Ch.1: Required Questions and Problems: No. 4, 9, 23, 26 and 28
|
January 18,
2008 |
| 2 |
Stresses in Flexible Pavements
A. Problems
to be solved manually with book charts, and equations:
Chapter 2. Problems No. 1, 3, and 4
Note: For problem 1, determine only the vertical, radial and tangential
stresses and strains (not the principals).
To
determine the principal stresses, refer to equation 3.2 (Chapter 3).
Extra credit for determination of
the principal stresses/strains.
B. Problems to be solved using KENLAYER program:
Chapter 2. Repeat problem 4 and compare Kenlayer results to your manual results in A.
Also, do
problems 5 and 6.
Note: it is not sufficient that you provide the outputs only. Identify all
problem inputs and required results in the printed outputs.
|
Monday, January 28, 2008 |
|
3 |
Stresses in Rigid
Pavements
- Chapter 4: Problems No. 4-1, 2,
3 and 4 (using equations)
- Chapter 5: Problems
5.3-4 and 5.7- 8 by KENSLAB program.
|
Wednesday, Feb
13, 2008 |
|
4 |
Analysis
of Traffic Loads
Chapter 6: Problems: No. 3, 6, 7 and 9 |
Wednesday, Feb 27, 2008 |
|
5 |
Material
Characterization
Download
Hw#5
Excel sheet
for test data for Q2. |
March 7, 2008 |
|
Projects |
Project 1:
Design of Flexible Pavements - US95 (Lewiston Hill to Moscow). Project
statements are e-mailed to each team. Teams are required to contact Dr. Bayomy for their assignment.
Project 2:
Design of PCC Rigid Pavement for US-12 between MP 2.197 to MP 2.620 in north
Lewiston.
Click
here
to view and download project statement (PDF file). |
Project 1 is due on
April 18, 2008
Project 2 is due on
May 2, 2008
|
| |
|
|
|