Design Project 1-General Project Description:
Design fixed-time control optimal control plans for the intersection using
2008 volumes for one of the following intersections:
 | SH 8 and Farm Road St. |
 | SH 8 and Warbonnet St |
Project Requirements:
-
Design report 1 is due at the beginning of class on
September 14th
-
You will be responsible for developing optimal signal
timing plans for the intersection given a set of future (projected) traffic
volumes for the year 2008.
-
All approaches operate “C” or
Better
-
You should conduct your analysis of the design
alternatives using the Highway Capacity Software
and the CORSIM simulation model.
-
Average control delay per vehicle, volume/capacity ratio,
and queue length should be used as your measures of effectiveness in
optimizing your design.
-
You may consider changes to lane configuration or
alignment as long as your design remains within the
existing curb-to-curb right of way.
-
The signal timing design will include the following
parameters: (1) phasing plan, (2)
cycle length, (3) green
splits, (4) pedestrian phase lengths, (5)
yellow time, (6) all-red
time.
-
You should define a set of phasing plans and a range of
timing parameters that are appropriate to be considered as alternatives for
your intersection.
-
The project report must be no longer than 20 pages,
including all text, figures, and tables.
-
The project report should clearly describe the design
alternatives that you considered (the range of values that you considered for
each parameter), the results of the analysis of the alternatives, your final
design parameters, and why you selected your final design parameters.
-
The report should also include all supporting information
including figures, tables, and computations.
Systems
engineering in CE474 Design Projects:
 |
Assess and review project requirements. |
 |
Document the extent of available resources. |
 |
ٌReview and
documentation of design options. |
 |
Summary of design parameters. |
 |
Plan for conducting analysis |
 |
Detailed design |
 |
Evaluation and testing --- Compare with requirements |
Design Project 1: Student Assignment
|
1
|
Kebab, Mohammad Wassim
|
Farm Road and SH8
|
|
2
|
Reed, James Evan
|
Farm Road and SH8
|
|
3
|
Arellano, Lisa Jo
|
Farm Road and SH8
|
|
4
|
Luo, Min
|
Farm Road and SH8
|
|
5
|
Candia-Martinez, Mario Guillermo
|
Farm Road and SH8
|
|
6
|
Pakalapati, Srinivas Raju
|
Farm Road and SH8
|
|
7
|
Wu, Lei
|
Farm Road and SH8
|
|
8 |
Carter, Steven
Neil |
Farm Road and SH8 |
|
9
|
Aeneni, Shravan Kumar
|
Warbonnet and SH8
|
|
10
|
McLenna, Patrick Michael
|
Warbonnet and SH8
|
|
11
|
Gangula, Sreenath Reddy
|
Warbonnet and SH8
|
|
12
|
Baden, Andrew Christopher
|
Warbonnet and SH8
|
|
13
|
Orton, Brent Lee
|
Warbonnet and SH8
|
|
14
|
Auch, Alisha Fern
|
Warbonnet and SH8
|
|
15
|
Carter, Steven Neil
|
Warbonnet and SH8
|
|
16 |
Palmer,
Charles Ray |
Warbonnet and SH8 |
|