|
Description |
Homework Problems |
Due Date |
Supplemental Material |
Solutions |
| Homework #1:
Assess your knowledge of the actuated signalized intersection basics. |
in-class handout |
8/21/06 |
None |
|
| Homework #2:
The objective of this homework assignment is to bring to the forefront
two very common issues with team assignments and how to address them.
Read the Hitchhikers and Couch Potatoes paper and write a one-half page
essay on how the paper applies to your experience. |
none |
8/23/06 |
(Hitchhikers
and Couch Potatoes paper) |
|
| Homework #3:
Design single point detector locations and passage times |
(doc) |
8/30/06 |
|
(xmcd) |
| Homework #4:
Dilemma Zone detection and passage time |
(doc) |
9/06/06 |
see ITD traffic manual on the reference
materials page |
(xmcd) |
| Homework #5:
Detection configuration and settings |
(doc) |
9/13/06 |
see ITD traffic manual and reading
handout #1 Problem 1 detector configuration (pdf)
Problem 3 approach (pdf) |
(xmcd)
problem 1 (pdf)
problem 3 (pdf) |
| Homework #6:
Performance Measurement, Pedestrian Signals, yellow, and All-Red
Intervals |
(doc) |
9/18/06 |
See ITD traffic manual
See MUTCD |
(doc) |
| Homework #7:
Traffic systems and context sensitive design |
(doc) |
9/27/06 |
problem 1 image (tif
) |
(doc) |
| Homework #8:
Phase plan, v/s ratios, and cycle length |
(xls) |
10/13/06 |
|
(xls) |
| Homework #9:
Pedestrian intervals (problems 1 and 2 in problem sets document) |
(doc) |
10/25/06 |
|
(xmcd) |
| Homework #10:
Phase plan, LT overlaps (problems 3, 4, and 5 in problem sets document) |
(doc) |
10/27/06 |
|
Problem 3(xmcd)
Problem 4 (xmcd)
Problem 5 (xmcd) |
| Homework #11 |
(doc) |
11/17/06 |
(sy7) |
(doc) |